AFC ELECTRIC, INC

PROPOSAL/CONTRACT

TERMS AND CONDITIONS

 1. Electrical shall be in installed to standards of the National Electric Code and is warranteed for one year. No other warranties are expressed or implied in this contract.

 2. AFC Electric Inc. is not responsible or liable in any way, for any part of the existing electrical system.

 3. AFC Electric Inc. shall make holes in the building to gain access for routing cables & consuit and shall not be held liable in any way for labor or cost incurred for paitning, texturing, repairing wall, concrete patching or ceiling. 

 4. Time and materials work shall be charged $85 per hour plus 40% on materials. 

 5. Permits, inspections and/or plans cost (and/or penalites) are required for this work and are the responsibility and liability of the party submitted to whom proposal are written. 

 6. Change order: Any alteration or deviation from the plan specifications involing extra time or costs, will be made only upon written agrement, and will become an extra charge to the contract price to be paid immediately. 

 7. Delay: AFC Electric Inc will be excused for any delay beyond our control. These delays may include, but are not limited to Acts of God, labor disputes, inclement weather, acts of owner or public authority, or other unforseen contingencies. 

 8. Right to Stop Work: If any payment under this contract is not made when due, AFC Electric Inc may suspend work on the job until such time as all payments have been made. Any failure to make payment is subject to a claim againset the property. 

 9. It is agreed that payment to AFC Electric Inc shall not be withheld to any delay or failed payments to the party to which the contract is written. 

 10. Malicious mischief and vandalsim on the job is the responsbility of the party submitted to AFC Electric Inc shall not be responsible for any damage resulting there-from. Party submitted to shall carry needed insurance. 

 11. All invoices are due upon receipt. Overdue accounts will be charged a late charge at the rate of 1.5% per month, or the maximun rate permitted by law, whichever is less. 

 12. In the event any part to this Contract commences any actions, legal or otherwise, to collect the contract price, the prevailing party shall be entitled to recover attorney's fees and all other costs ncurrec in connection with the action. 

 13. This proposal shall be effective for thirty days from the date first set forth above. If this propsal is not accepted within this time it may be expired at AFC Electric nc fiscretion. This proposal may be withdrawn any time before acceptance.

 14. The language of all parts of this contract shall in all cases be construed as a whole, according to its fair meaning, and not stricly for or against any of th parites. No provision shall be deemed dependant upon any other. 

 15 If any provision of this contract is held by an arbritrator or court to be unenforceable, invaild or illegal, said provision shall be deemed to be deleted and shall not affect the validity of the remaing provisions of this contract. 

 16. Subsititio of Materals: AFC Electric Inc may subsitute materials without notice to the Owner/General in order to allow wokr to proceed provided that subsituted materials are of no lesser quality. 

 17. Party submitted to shall give written notice of a back charge to AFC Elecric Inc within ten days of the act giving rise to a back charge. If no such notice is given within the ten days period the back charge shal not be allowed. No moneys may be deduced from the contract without AFC Electyricd Inc agreeing to the legitimacy of said baccharge. 

 18.In the event party submitted to does not request work to begin and/or the project is not in good condition to commence the wokr within 30 days after the acceptance of this Contract, AFC Electric Inc shall have teh option to terminate this Contract.